Why Can Take Anywhere from a Few Days to Several Months from Contract Signing to Roof Installation?

Why Can Take Anywhere from a Few Days to Several Months from Contract Signing to Roof Installation? - Image 1

Many homeowners expect that once the contract that once the contract is signed, their new roof will be installed almost immediately. Sometimes that does happen — but in many cases, the process can take weeks or even months. This is completely normal and depends on several important factors. We believe in transparency, so here’s how it really works.

1. The Insurance Claim Process

When a roof replacement is related to storm damage (hail, wind, etc.), the timeline largely depends on the insurance company.

This process may include:
• filing the insurance claim;
• scheduling an inspection with the insurance adjuster;
• reviewing and approving the scope of work and pricing;
• handling supplements or re-inspections if needed.

Some claims move quickly, while others take longer — especially during storm season.

2. Deductible: A Required Homeowner Responsibility

Your deductible is the portion of the claim that the homeowner is legally required to pay. This is not optional and cannot be waived.

At Advantage Remodeling and Roofing, we:
• clearly explain your deductible upfront;
• help you understand when and how it must be paid;
• follow all legal and ethical guidelines — we never offer to “cover” or bypass the deductible.

In many cases, resolving the deductible is a necessary step before work can begin, which can affect the overall timeline.

3. Financing Options That Help You Move Forward

We understand that paying a deductible or additional out-of-pocket costs upfront isn’t always convenient. That’s why Advantage Remodeling and Roofing offers flexible financing options designed to help homeowners move forward without unnecessary delays.

Our financing solutions allow you to:
• start your roofing project sooner;
• spread payments over time;
• avoid postponing repairs due to financial stress.

Financing approval can take anywhere from a few hours to a few days, which may impact scheduling — but it often helps accelerate the project overall.

4. Material Ordering and Scheduling

Once insurance approval, deductible arrangements, and financing are finalized, we:
• order roofing materials;
• schedule your project in our production calendar;
• coordinate installation based on availability and weather conditions.

During peak seasons (spring, summer, or after major storms), scheduling windows may be longer — but we always keep our clients informed.

5. Weather Conditions Matter

Even when everything is approved and scheduled, roofing work:
• cannot be done in the rain;
• may be postponed due to high winds or extreme temperatures.

Safety and quality always come before speed.

Final Thoughts

The time between signing a contract and installing your roof can range from:
just a few days in the best-case scenario;
several weeks or even months when insurance, deductible, or financing steps are involved.

Our goal is not just to replace your roof — it’s to:
• protect your home;
• guide you honestly through the insurance process;
• help you navigate deductible and financing options;
• and deliver quality work with clear communication every step of the way.
If you have questions about timelines, deductibles, or financing, the team at Advantage Remodeling and Roofing is always ready to help.

our service area

We serve the following areas

Our Locations:

Advantage Remodeling and Roofing Co
6000 Alma Rd
#404
McKinney, TX 75070
1-214-891-5907
Top
Service Area
Free Quote